Our company was involved in the upgrading of the main North/South road at the 'A' Plant. This was done in reinforced concrete.

 

 

wp6c7083e3_0f.jpg
wpa37f149c.png

 

Civil infrastructure, earthworks, roads and stormwater drainage, sewage reticulation, sewage pump stations and rising mains, earth & concrete small dams, pipelines and reservoirs, reticulation and elevated towers, marine works, fuel installations, sporting facilities, swimming pools, security fences, survey, geotechnical for civil works, building services (wet), paving, roadworks, low level causeway bridges and culverts, industrial surfacing, water supply, and general civil works.

 

 

wp52496fbe.png
wp786c812a.png
wp7f1b55e4_0f.jpg
wp3d42c576_0f.jpg
Before
After
We were involved in the project from the initial site investigation stage, Geotech report, piling through to commisioning of the Brewery. Our involvement was mainly all civil works on site.
A new world record was set for the time frames in which a brewery of this nature was completed.
wpc3ad6800.png
wp6781f77c.png
wp6ec9f5eb_0f.jpg
wpc21d323a_0f.jpg
Pump Station
Ponds

Our practice designed and supervised the new sanitation and water supply and were involved in the construction of the sewerage treatment plant, installation of one monitoring borehole and installation of sewer gravity mains, as well as the construction of toilet cubicles at 26 erven, including the associated erf connections into the gravity main, house drainage connections and plumbing work. We were also involved in the installation of the sewer raising main from the pump station to the treatment works over a distance of 2,3km, as well as construction of the sewer pump station and the water supply well including all mechanical and electrical equipment and all associated pipe work.

wp6efd3f3a_0f.jpg
wpc2ca32b7.png
wp3a1e42c8.png
wp9c2bcadd.png
wpd1194558_0f.jpg
Transnet Projects:
228 Additional reefer points as well as roads and civil services are being executed. This includes the supervision of the construction of an access road, civil services, reinforced concrete works as well as parking bays etc.
wp68f49338.png
wpf1cf82ba.png
Our practice designed and supervised the construction of the waste disposal slots, leachate dam, visibility berm, stormwater diversion measures, earth dam wall, drilling at two monitoring boreholes & erection of security boundary fence & vehicle access gates.
wp70b472bf_0f.jpg
wp7d4271b0.png
wp134851f3.png

 

Cacadu Municipality - Construction of causeway bridges, road paving and stormwater as well as rehabilitation of water supply canals.

 

 

 

 

wp7c45a365_0f.jpg
Water canals
wpff4874fc_0f.jpg
wpcc45679a_0f.jpg

Irragation channels, rehabilitated in 1999

wp31fa46e9_0f.jpg
wp92025fe8.png
wpc8218635.png
wpde8fc690_0f.jpg
Dept of Public Works:
Our practice is the Lead Consultants in the proposed rationalsation plan for the PE Hospital complex, in association with Ninham Shand Consulting Engineers. Our contribution to the civil and structural works include sewers, water supply, new rc water tower, stormwater reticulation system, demolitions, new buildings.